From folder to drawing
Open, zoom and pan to the area you need. You do not need to install a separate CAD program first just to view the drawing. The original file remains available to download.
On site, answers need to be close at hand. Fidrel displays DWG drawings in your mobile browser, within the project’s document structure.

Open, zoom and pan to the area you need. You do not need to install a separate CAD program first just to view the drawing. The original file remains available to download.
Document numbers, descriptions and document revisions explain what each file covers. Version history separates new uploads from earlier information. Select several files to download a ZIP with their metadata.
External references, specialised objects and fonts may not be fully represented. Read the compatibility information and check the original when accuracy or complete content is critical. Access follows the project’s permissions.
How the work connects
Documents, reviews, estimates, invoices and schedules are integrated in the same project. Less searching and fewer handovers. More time for the work that moves the project forward.